TOGO | KPALIME | 30HA
Last update of the data : 26/07/2025

Status: Being deployed
(site securing, ground preparation)
I participate
  • Agriculture
  • Energy

PROJECTIONS (K€)

FUNDING NEEDS (K€)

  • RAISEDIn progress
  • AMOUNT1 200k€
  • INTEREST DEFERRAL0
  • MATURITY3 YEARS
  • Break-even point3 YEARS
  • TYPEBOND
  • ANNUAL RATE6%
  • Trigger threshold250k€
    REACHED
  • Progress295k€ / 25%
  • Return on investment297%

PROJECTIONS (K€)

FUNDING NEEDS (K€)

11796
  • RAISEDà venir
  • AMOUNT11 796k€
  • INTEREST DEFERRAL---
  • MATURITY---
  • Break-even point---
  • TYPE---
  • ANNUAL RATE---
  • Trigger threshold---
    ---
  • Progress---
  • Return on investment---
I participate
  • Area
  • Land
  • Agriculture
  • Energy
  • Forecast
  • Planning
  • Agriculture
  • Energy
Soil preparation / Site securing
01/2025 - 08/2025

  • Clearing / Stump removal
  • Plot definition
  • Perimeter fencing (Barbed wire) (2000m)
  • Plowing / Harrowing (15ha)
  • Cattle/Sheep fencing area (8ha / 900m)
  • Poultry fencing area (3.6ha / 600m)

Overall progress

Crops
06/2025 - 10/2025

  • Cosmetic / Medicinal plant nurseries (25,000)
  • Banana plantation (3,200)
  • Coconut plantation (350)
  • Palm tree plantation (100)
  • Vanilla plantation (1ha)
  • Coffee / Cocoa plantation (3,600)
  • Fruit tree plantation (mango, avocado, etc.) (300)
  • Start of market gardening crops (2ha)

Overall progress

Livestock
08/2025 - 11/2025

  • Pasture plots for cattle/sheep (16)
  • Cattle/Sheep buildings (6)
  • Poultry buildings (8)
  • Fish farming ponds (52)
  • Start of cattle/sheep farming
  • Start of poultry farming
  • Start of fish farming

Overall progress

Irrigation
05/2025 - 10/2025

  • Boreholes (3)
  • Water retention ponds (2)
  • Irrigation of crop plots
  • Irrigation of cattle/sheep plots
  • Irrigation of poultry plots
  • Irrigation of fish farming plots
  • Water supply for Agro-processing building

Overall progress

Supports and solar panels
10/2025 - 06/2026

  • Orders and deliveries
  • Installation (Stage 1) (18,000)
  • Installation (Stage 2) (18,000)

Overall progress

Storage and distribution
01/2026 - 06/2026

  • Lithium storage
  • Power supply to Agro-processing buildings
  • Electrolyzer installation
  • Hydrogen storage
  • Public network distribution

Overall progress